LOOSE AGGREGATE DELIVERY
We supply recycled coarse capping aggregate commonly requested as 6F2 or 6F5, for fill and larger groundwork build-ups. Tell us the material named for your job, the amount and delivery postcode for a loose tipper quote from Appley Bridge.
Capping aggregate is used in groundwork build-ups to form a supporting layer beneath a further sub-base. It is also used for suitable bulk-fill work, where the construction needs a coarse granular material.
6F2 and 6F5 are closely related terms, but the technical classes distinguish site-derived material from imported capping. Keep the material name from the job details when enquiring so the quote identifies what will be supplied.
In highway terminology, this is coarse capping material derived from the same site. The name is also widely used commercially when people ask for recycled capping aggregate.
This is the related coarse capping class for material brought in from outside the site. If the job calls for 6F5, use that name when asking for the delivered material.
Capping and MOT sub-base are separate layers. A job may use coarse capping below a Type 1 or Type 3 layer, so keep their material names and quantities separate.
Send the tonnage you need, or the dimensions and planned depth of the layer. For a larger job, tell us if the material is needed in stages and how much space there is for tipped aggregate.
We deliver loose by tipper from Appley Bridge. Include the postcode, preferred date, entrance and unloading details. Plan the tipping point around how the coarse material will be moved and placed.
They are often used together in trade, but their technical classifications are different. 6F2 relates to site-derived capping, while 6F5 covers the related imported material. We will make the quoted product clear.
No. Coarse capping and a Type 1 sub-base serve different layers in the construction. Tell us which material and amount your job needs.
Send the dimensions and planned depth, or the calculated tonnage. Explain the use and whether deliveries need to follow the progress of the work.
The material name, amount, postcode, preferred date and tipping access. If your job has a material description, include it with the enquiry.
Send the capping material named for your job, the quantity and delivery postcode. Tell us the timing and tipping access so we can quote the material and delivery together.
Include the material, quantity or measurements, delivery postcode and access details.